Gibbs & Olson Awarded Astoria, Oregon 11th Street Combined Sewer Overflow Project

is it a bad idea to hook up with your ex site gratuit rencontres ligar pela internet gratis para celular site de rencontre gratuite 17 site de rencontre pour futur parent http://www.qiongbupa.com/martisd/3303 site de rencontre saguenay gratuit http://onsc4x4.com/?mariypol=rencontre-x-center-plan-de-campagne&a62=17 balvenie single malt scotch brands that site Gibbs & Olson was selected to complete surveying, design and construction phase services for the City’s combined sewer overflow (CSO) separation project. The project includes over 9,000 feet of new storm sewer pipe along 8th through 12th Streets. The $6 million project represents the next step in completing the City’s 20 year program of reducing or eliminating CSOs. This project includes the physical separation of stormwater from the sanitary sewer system. The new storm sewer conveyance system will bypass the City’s interceptor to the wastewater treatment plant and discharge the stormwater, which has not been co-mingled with sanitary sewer, directly to the Columbia River.