Mill Street Restoration

Client—City of Kelso, Washington

Gibbs & Olson provided the surveying and design for this TIB funded grind and overlay project. The project included 2,800 feet of roadway improvements along with associated concrete curb and gutter, driveways, ADA ramps and sidewalks. Stormwater improvements included 400 feet of ductile iron storm drain pipe with ten catch basins.